xViz Gantt Chart: Displaying Various Symbols based on Conditional Formatting

Srushti Subhash Bachchuwar
October 24, 2023

It is important to keep track of the progress, resource availability, and delays in project management. The xViz Gantt Chart offers the capability of implementing Conditional Formatting, enabling users to highlight data based on specific conditions and criteria.

Conditional Formatting enables the prioritization of tasks and milestones based on data-driven rules. Using Conditional Formatting in the Gantt chart enhances the data visualization in the form of coloring the bar, changing the shape, highlighting the color of the milestone, altering the data grid font color, and/or using different status flag symbols.

Gantt Chart with Conditional Formatting
Figure 1: xViz Gantt Chart with Conditional Formatting

Methods to implement Conditional Formatting:

The xViz Gantt Chart provides the capability to apply conditional formatting using Rules or Color Scale, as shown below:

Methods to configure conditional formatting
Figure 2: Methods to configure conditional formatting
  1. Rules-based formatting:  Define specific conditions using the data column and threshold values which can be static or data-driven. 
  2. Color Scale formatting: Apply a color scheme to indicate the magnitude of progress.  We can Apply Conditional Formatting on Milestone, Timeline Bar, Data Grid, and Status Flag.
Apply conditional formatting to various elements
Figure 3: Apply conditional formatting to various elements

Learn more about Conditional Formatting here.

Conditional Formatting using Status Flag Symbols:

Consider a scenario where a project is in its planning phase, with the team actively gathering requirements and strategizing for design and development. To facilitate easy tracking of team progress by the manager, the report can have a variety of symbols with different colors to provide at-a-glance insights into the progress status in the timeline. This allows the manager to quickly assess progress without looking into detailed data.

Status Flag can be used on multiple rules simultaneously. We can highlight each condition with different symbols and can use different colors to highlight those symbols.

Consider the Conditions where -

1. When the progress reaches 100%, it is marked with a Green Bookmark symbol for highlighting

2. The team is actively engaged, and their progress falls within the range exceeding 50%, highlighted with the Yellow Flag symbol

3. The team has recently initiated their tasks and has not yet reached the halfway completion point, highlighted with the Red Upward Symbol

To set up the flag-based conditional formatting, add conditional formatting as shown in the screenshot below. Key configurations include:

  1. Color of the symbol
  2. Applied To: Status Flag
  3. Icon for the status flag
  4. Condition

Here is an example of the configuration for 100% progress status condition mentioned above:

Conditions applied based on Status Flag
Figure 4: Conditions applied based on Status Flag

Simialrly, when all the three conditions are configured, the result is as shown below:

Symbolic representation of Conditions applied
Figure 5: Symbolic representation of Conditions applied

The xViz Gantt Chart provides a range of distinct 260+ symbols and provides the search option based on the requirement.

Symbols
  Figure 5: Different Symbols for Status Flag

In xViz Gantt Chart you can use different techniques to highlight and represent various data-driven conditions. Check out the Alerting Technique blog for more on Conditional Formatting in the xViz Gantt Chart.

Explore the different functionalities of the xViz Gantt Chart (Microsoft Certified) from Microsoft AppSource here.

xViz
About xViz!
xViz is a leading provider of advanced enterprise-grade visuals for Microsoft Power BI. The powerful, intuitive, and customizable data visualization experience of xViz, maximizes the potential of the data and elevates analysis to new heights. This product is developed by Lumel Technologies (formerly Visual BI), which has a decade of experience in building add-on solutions on top of BI platforms (SAP BI and Power BI) with our suite of innovative products such as Inforiver, xViz and ValQ.
PBI Certified

Headquarters

5920 Windhaven Pkwy
Plano TX 75093

cross linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram